National Schedule of Rates Access & Adaptations 2026/2027

SKU: 994835
Stock Status: Available to Order- Stock Due

Now Available in SMM7 & NRM versions

FIRM SALE: PLEASE BE AWARE THAT WE ARE UNABLE TO ACCEPT RETURNS ON NSR TITLES.

Description

National Schedule of Rates – Access & Adaptations 2026/2027

The National Schedule of Rates – Access & Adaptations 2026/2027 is a comprehensive cost guidance reference for accessibility, access audits, building adaptations and associated construction works across new and existing buildings.

An Access Audit is a commonly used process for assessing the accessibility of buildings, external areas and services. The scope and format of an access audit can vary depending on the client, the nature of the facility and the person undertaking the assessment.

In its most common interpretation, an access audit assesses how effectively an environment and its method of service delivery meet the needs of existing and potential users. This may include staff, visitors and volunteers with a range of mobility, sensory or cognitive impairments or accessibility needs.

Access Audits and Accessibility Improvements

During an access audit, potential barriers are identified and recommendations are made for appropriate changes or enhancements. These recommendations can range from relatively minor improvements to substantial construction and alteration works.

Some recommendations may involve changes to management practices, while others may be incorporated into routine maintenance, refurbishment or redecoration programmes. Having appropriate cost guidance alongside an access audit can help professionals assess the likely financial implications of recommended improvements.

Accessibility Considerations

Accessibility encompasses a broad range of spatial, visual and audio considerations. Effective accessibility can involve both physical alterations and improvements to the way buildings, facilities and services are designed and delivered.

Examples of accessibility considerations include:

  • Accessible car parking and external routes
  • Footpaths and pedestrian access
  • External and internal ramps and steps
  • Accessible entrances, doors and doorways
  • Lifts and other access provisions
  • Accessible sanitary facilities
  • Appropriate lighting design
  • Colour, contrast and surface treatments
  • Internal and external signage and wayfinding
  • Visual alert systems
  • Hearing enhancement systems
  • Accessible fixtures and fittings

Cost Guidance for Access & Adaptations

Alongside the recommendations arising from an access audit, it is helpful to have an indication of the likely cost of proposed works or, at the very least, a reliable budgetary indicator.

The National Schedule of Rates (NSR) provides structured cost guidance covering a wide range of construction, maintenance and adaptation activities relevant to accessibility improvements.

The Access & Adaptations 2026/2027 schedule can therefore be used as a valuable reference when considering the potential costs associated with access improvements, building alterations and related works.

Sections Covered Within the Access & Adaptations Schedule

The schedule covers a broad range of building and construction activities, including:

  • A: Contractors General Cost Items
  • C: Demolition / Alteration / Renovation
  • D: Groundwork
  • E: In-situ Concrete / Large Precast Concrete
  • F: Masonry
  • G: Structural / Carcassing / Metal / Timber
  • H: Cladding / Covering
  • J: Waterproofing
  • K: Linings / Sheathing / Dry Partitioning
  • L: Windows / Doors / Stairs
  • M: Surface Finishes
  • N: Furniture / Equipment
  • P: Building Fabric Sundries
  • Q: Paving / Planting / Fencing / Site Furniture
  • R: Disposal Systems
  • S: Piped Supply Systems
  • V: Electrical Supply / Power / Lighting Systems
  • W: Communications / Security / Control Systems
  • Z: Building Fabric Reference Specification

Access & Adaptations – SMM7 & NRM Sections

The SMM7 and NRM versions of the Access & Adaptations schedule provide additional coverage of specific accessibility-related building and external works.

  • Y15: Car Parking
  • Y17: Footpaths
  • Y18: Street Furniture
  • Y19: Signage and Wayfinding (Externally)
  • Y20: External Ramps and Steps
  • Y21: Finishes and Surface Treatments (Externally)
  • Y22: Windows, Doors and Doorways
  • Y24: Internal Ramps and Steps
  • Y25: Fixtures and Fittings
  • Y26: Finishes and Surface Treatments (Internally)
  • Y27: Decorating (Internally)
  • Y28: Decorating (Externally)
  • Y29: Signage and Wayfinding (Internally)
  • Y30: Sanitary Conveniences
  • Y32: General Building Works
  • Y33: Mechanical and Electrical

Who Is the Access & Adaptations Schedule For?

This schedule is intended as a useful reference for professionals involved in accessibility assessments, access audits, building adaptations, construction, maintenance and property management.

  • Access auditors
  • Quantity surveyors
  • Building surveyors
  • Architects
  • Building contractors
  • Maintenance contractors
  • Facilities managers
  • Property managers
  • Local authorities
  • Housing providers
  • Construction consultants
  • Accessibility professionals
  • Procurement and project management teams

Access Auditing Guidance

Guidelines for undertaking and commissioning access audits are set out in the Centre for Accessible Environments' Access Auditing handbook, which provides a useful companion reference to the National Schedule of Rates Access & Adaptations guide.

Further information about the Centre for Accessible Environments and its resources can be found on their official website .

2026/2027 Edition

This is the 2026/2027 edition of the National Schedule of Rates – Access & Adaptations, providing cost guidance for accessibility improvements, building adaptations and associated construction works.

Whether used alongside an access audit, during project planning, for budgeting purposes or when assessing proposed adaptation works, this schedule provides a structured reference covering a wide range of accessibility-related construction activities.

Important Information – Returns

Please be aware that we are unable to accept returns on NSR titles.

Product Information
ISBN 9781913866015 / 9781913866138
Publication Status Current
Publication Date 2026-08-10
Edition 2026/2027 Edition
Format (Paperback, Hardback etc) Paperback
Brand / Publisher NSR
Publisher NSR Management
Delivery

We offer customers a wide range of delivery options & costs ... including our quickest service - Next Day by 10:30 (M-F only, subject to location and stock availability).

  • Simply choose your preferred service when checking out
  • We show our current stock levels on each product page and in the basket
  • Orders received after 3:45pm will be processed on the next working day.
  • Orders received after 3:45pm on Fridays or over the weekend will be processed on Monday (excludes bank holidays).
  • Unless specifically requested, our delivery partners will not attempt a weekend delivery
Returns

Unless we state "FIRM SALE" on the product page, we offer customers a "No Quibble" 28 day returns policy on hard copy books.

If you need to return a title for any reason ...

  • Contact our customer services team first to explain what you are returning and the reason
  • Request a Returns Authorisation Number
  • We will email you this and a link to arrange your return quickly & easily via Royal Mail
  • Take your return to your nearest Post Office and they will do the rest

PLEASE NOTE THAT ALL BRITISH STANDARDS ARE PRINT ON DEMAND AND NON-RETURNABLE

Please refer to our Returns page for full details & charges.

Loading...