JCT Standard Building Sub-Contract Conditions 2016 (SBCSub/C)

In stock
SKU
1481315
Stock Status: In Stock (Only 1 left)
Now £98.38 £81.98 was £98.40

  • Free standard delivery
  • Best price guaranteed
  • Fast same-day shipping
  • Over 20 years experience
  • Family-run business
-
+
or
More Information
ISBN 9780414059412
Publication Status Current
Publication Date 31/10/2016
Author The Joint Contracts Tribunal
Edition 2016 Revised Edition
Format (Paperback, Hardback etc) Paperback
Brand / Publisher JCT
Publisher Sweet & Maxwell

The JCT Standard Building Contract is designed for large or complex construction projects where detailed contract provisions are needed. Standard Building Contracts are suitable for projects procured via the traditional or conventional method.

Features of projects using the Standard Building Contract:

  • The employer is responsible for the design, and this is usually supplied to the contractor by the architect or design team working on the employer’s behalf. However, Standard Building Contracts also have optional provision for a ‘Contractor’s Designed Portion’, if the appointed contractor is to be responsible for the design of specific parts of the works.
  • Depending on the type of Standard Building Contract used, the employer (through its advisers) will need to provide drawings and specifications, works schedules or bills of quantities to specify the quantity and quality of work at tender stage.
  • Standard Building Contracts are normally administered either by the architect, quantity surveyor, or a contract administrator.
  • Works can be carried out in sections.
  • MAY BE USED WHERE:

  • The Standard Building Sub-Contract is made up of two parts: the Sub-Contract Agreement (SBCSub/A) which includes the Recitals, Articles and Sub-Contract Particulars, and the Sub-Contract Conditions (SBCSub/C).
  • It is for use when the main contract is one of the Standard Building Contracts (SBC/Q, SBC/XQ, or SBC/AQ) and where the appointed sub-contractor is not required to design (if design is required see Standard Building Sub-Contract with sub-contractor’s design).
  • It can be used when either main contract works or the sub-contract works are to be carried out in sections.
  • It can be be used for sub-contract works that are to be carried out on the basis of an adjusted sub-contract sum (adjustment for variations etc.) or by complete re-measurement.
  • Provisions are included for collaborative working, sustainability and bonds (off-site materials and retention).
Download contents page