JCT 2011-2016 Tracked Changes
The JCT Tracked Change document service provides a fully tracked change version of each of JCT’s main contracts, sub-contracts and sub-subcontracts.
The service is a benefit to professional advisers who advise their clients (employers, contractors, cub-contractors) of the changes, or any construction professional looking for a reference between the 2005 and 2011 editions. In particular, the tracked change documents highlight the changes made as a result of the amends to the Construction Act which came into force on 1st October 2011.
- JCT Design and Build Contract 2016 - Tracked Changes (DB TCD)Now £124.99 £124.99 was £125.00
- JCT Intermediate Building Contract 2016 (IC) Tracked Change DocumentNow £124.99 £124.99 was £125.00
- JCT Intermediate Building Contract with contractor's design 2016 (ICD) Tracked Change DocumentNow £124.99 £124.99 was £125.00
- JCT Minor Works Building Contract - Tracked Changes 2016 (MW TCD)Now £124.99 £124.99 was £125.00
- JCT Minor Works Building Contract with Contractor's Design - Tracked Changes 2016 (MWD TCD)Now £124.99 £124.99 was £125.00
- JCT Standard Building Contract With Approximate Quantities 2016 (SBC/AQ) Tracked Change DocumentNow £124.99 £124.99 was £125.00
- JCT Standard Building Contract With Quantities 2016 (SBC/Q) Tracked Change DocumentNow £124.99 £124.99 was £125.00
- JCT Standard Building Contract Without Quantities 2016 (SBC/XQ) Tracked Change DocumentNow £124.99 £124.99 was £125.00